DUOBAT 120+ | Sports Floor System

PRE-INSTALLATION AND STORAGE

START-UP: MOISTURE BARRIER

STEP 1: FACE WALL BATTENS

STEP 1: START AND SPACING BATTENS

STEP 1: CALCULATOR (DISTANCE A)

STEP 1: STRING MARKER (J-LOCK LINE A)

STEP 2: GABLE BATTENS

STEP 2: UPPER BATTENS (SECOND ROW)

STEP 2: TEMPORARY SUPPORT

STEP 2: LOWER BATTENS

STEP 2: UPPER BATTENS (EVERY FIFTH)

LEVELLING: EVEN SUBFLOOR

 

LEVELLING: UNEVEN SUBFLOOR

STEP 3: UPPER BATTENS (REMAINING)

FLOOR BOARDS: CENTER FLOOR BOARD AND LOOSE TONGUES

FLOOR BOARDS: FLOOR PATTERN

FLOOR BOARDS: 10-BOARD MEASUREMENT

FLOOR BOARDS: NAILING AND LAST ROW FLOOR BOARD

SKIRTINGS

BUSHINGS

keyboard_arrow_up



picture_as_pdf